Skip to content
Local craftsmanship. Personal contact.
A guide to older year-round homes

Energy renovation of an older home: what to do first

Cold rooms, draughts around windows or a roof that needs replacing can be reasons to consider your home's energy improvements. Based in Hvilsom, Hvilsom Tømrer og Snedkerforretning ApS helps with carpentry, roofing, windows and insulation, primarily on projects around Hobro and Viborg.

40+years of carpentry experience with Arne

Arne & Frederik Albertsen

Owners & Master CarpentersGet to know the company
Assess the roof, windows and insulation together
Address moisture and ventilation before insulating and sealing
Coordinate energy improvements with other renovation work
Home energy renovation

How to prioritise energy improvements in your year-round home

Short answer

Where should energy renovation of an older year-round home begin?

Begin with a combined assessment of the roof, windows and insulation so you can prioritise the home's weak points rather than choosing a solution in advance. Moisture and ventilation need to be considered before adding insulation or making the home more airtight. The price depends on the home's condition and the specific work agreed.

Get a price for your own project

Look at the whole home before choosing the first task

Start by gathering your observations: Where do you notice draughts, which rooms are hard to keep warm, and are there signs of condensation or moisture? Drawings and information about previous renovations can help establish what has already been done. These symptoms are a starting point for an assessment, not a conclusive explanation of their cause.

The roof, windows and insulation form part of the building envelope, which separates heated rooms from the surroundings. It is worth assessing them together. A well-insulated loft will not necessarily resolve draughts around windows, and new windows will not improve a poorly insulated roof structure. Also consider whether existing windows can be retained or improved before choosing replacements.

Include moisture and ventilation in the improvements

Signs of moisture, leaks and damaged timber should be investigated before structures are covered with new insulation. When adding insulation to a loft or roof, the existing insulation and the structure's airtightness need to be assessed. A vapour barrier, where used, limits moisture from indoor air entering the structure; the solution must suit the particular roof and ceiling.

Ventilating the home's rooms is different from ventilating the roof structure itself. Both need to be assessed when the home becomes more airtight. Insulation must not block necessary ventilation openings, and the home's air exchange must still be able to handle moisture from everyday use. Airing out rooms matters, but it does not replace a correctly designed and built structure.

Choose the order based on condition and access to structures

A leaking roof or active moisture damage should be dealt with before improvements that could conceal the problem. If the roof covering is already due for replacement, it makes sense to investigate insulation options and requirements at the same time. This allows roofing, airtightness and insulation to be planned together rather than as separate tasks.

If windows are being replaced, their position and junctions should be considered alongside any later changes to the facade and insulation. Interior renovation can also provide access to structures that would otherwise remain concealed. There is no single right order for every older home: plan around its condition, access and the work you have already decided to do.

Clarify energy requirements, even when renovating in stages

The Danish Building Regulations distinguish between alterations and replacement of building elements. For alterations, energy-saving measures must be carried out where they are cost-effective and do not create a risk of moisture damage. When building elements are replaced, energy requirements generally apply regardless of cost-effectiveness. The applicable requirements therefore depend on the specific work; any exemptions and matters requiring clarification with the authorities must be assessed for the project.

If work is divided into stages, each stage should be planned with the next in mind, but energy requirements for the current work cannot simply be postponed to a later stage. Agree which structures and finishes will be affected now and what needs to be prepared for later. Hvilsom Tømrer og Snedkerforretning ApS can help with drawings and work involving the authorities when this is part of the agreed scope.

Prepare for the first conversation

Three things that help you move forward

01

Tell us about your home and plans

Use the contact form and Frederik will call you to clarify the work and price. You can also call Frederik directly on 21 71 90 72 or the company on 98 54 84 15. Include any draughts, moisture problems and renovations you are already planning.

02

Clarify how the work fits together and what comes first

We discuss the relevant carpentry work with you and establish whether the home needs to be visited. The roof, windows and insulation are considered together with moisture, ventilation and any project requirements.

03

Agree the scope and sequence

We agree which tasks will be carried out and how they fit with the rest of the renovation. The scope, material choices and necessary preparation form the basis of the price for your specific project.

Good to know

Questions and answers

Have a question about your own project? Call or email us.

Should I start with windows or insulation?

It depends on the home's condition. Leaking or damaged windows may warrant priority, while a poorly insulated loft could make loft insulation the first consideration. Also consider planned roof or facade work so that improvements and their junctions fit together.

Can adding insulation cause moisture problems?

Yes, if the work does not account for the structure's moisture conditions, airtightness and ventilation. Existing moisture and damage therefore need to be investigated, and the solution adapted to the home. New insulation alone does not resolve moisture damage.

Does the loft need extra insulation when the roof covering is replaced?

Replacing the roof covering can trigger insulation requirements under the rules for alterations. This depends on factors including the existing structure, cost-effectiveness and the risk of moisture damage. If the entire roof structure is replaced, energy requirements need to be assessed under the rules for replacement of building elements.

Can energy renovation be divided into stages?

Yes, if stages are planned so that later work does not damage completed solutions. Junctions between windows, facade and roof need to be considered in advance, and requirements for the work being carried out now need to be clarified within the current stage.

What does energy renovation of an older home cost?

The price depends on the selected work, the home's condition, access to structures and the materials. Hidden damage and the need to alter existing construction can also affect the scope. Frederik can clarify the work and price with you; call directly or use the contact form to receive a call.

From your idea to a clear price

Get a price for your renovation

Tell us where the work is needed and what you would like done. When you submit the form, Frederik will call you to discuss the details and give you a price for the work.

You are also very welcome to call

Have the first conversation directly with Frederik.

21 71 90 72
  • A brief description is enough to get started
  • You receive a call — no automated price calculation
  • Skip optional questions if you are unsure

Tell us about your project — we will call you

What can we help with?
Have more details? Add them here (optional)

Tell us about the scope, design and function, access or any other details. Skip anything you do not know yet.

Where is the work needed?
How can Frederik reach you?
Personal contact

You are very welcome to call us directly

Hvilsom Tømrer

Based in Hvilsom
Søhalevej 8, 9500 Hobro
CVR 20606835

98 54 84 15

Arne Albertsen

Owner & Master Carpenter

20 44 84 15arne@hvilsomts.dk

Frederik Albertsen

Owner & Master Carpenter

21 71 90 72frederik@hvilsomts.dk